Newsletter Sign Up
To keep up to date with news, offers and promotions please enter your email address below.

University of Nottingham Biodiscovery Institute

University of Nottingham Biodiscovery Institute

Our customer FBS Contracts, working alongside GF Tomlinson Limited and the University of Nottingham, recently completed a second major fit-out at The University of Nottingham.

Fitted Furniture for laboratories

GF Tomlinson invited FBS Contracts Limited to participate in the design and coordination of the fitted furniture package. Design meetings were held with end-users from each department, the M & E sub-contractors, and Benoy Architects to provide a personalised experience for the customer.
The use of an Autodesk Revit 3D modelling package meant that the client could view a 3D image of how each laboratory would look, allowing for any changes to be made in a cost-effective way.

High-performance Materials Required

The early engagement of FBS Contracts as the furniture contractors allowed them to test and purchase specialised materials suitable for the environments they were fitting. It also enabled them to coordinate production around a tight installation schedule running concurrently across 2 floors.

£23m Research Facility

FBS Contracts ordered over 1000m2 of 16mm Trespa® TopLab®BASE from Performance Panels for the project at the new University of Nottingham Biodiscovery Institute.

The £23m research facility was built to house around 350 academics, researchers and PhD students across five floors of state-of-the-art laboratories and research space. This permits experts in serious diseases (including cancer, cardiovascular, liver, bone and respiratory conditions) currently located at six separate University of Nottingham sites, to work together. 

The design for the centre was based around large fixed laboratory workstations for the academic students, with small areas of fixed benches and mobile tables for the research areas. All the Trespa® TopLab®BASE worktops were fully supported on steel leg frames to give a high load capacity, together with mobile units to give total flexibility.

Why Choose Trespa® TopLab®BASE?

Graham Heyes at FBS Contracts told us why they chose Trespa TopLab Base:

 "Trespa® TopLab®BASE E0-02 Silver Grey was selected for its hard-wearing properties, ideal for areas with such high use. All worktop surfaces and wall shelves were fitted with Trespa TopLab Base, together with some specialist component parts throughout the building."

He continued " We use Trespa when high impact, scratch and wear & tear resistance are needed. The surfaces have a smooth surface making them easy to clean."

Request a Sample from us

View our extensive range

Performance Panels offers a wide range of UK stocked 
materials for a fast turnaround. Our free sample request app
allows you to see the colour and quality of your chosen material.

Other Projects

Sampled SMART Labs, Scotland

For a UK biobanking and bioprocessing hub based in Scotland, Trespa® TopLab® BASE is the top choice. With over 50 years’ experience, Roylance Pharma are recognised as leading UK based specialists in biobanking and stability storage of pharmaceutical and...

University of St. Andrews

Lab UK (Furniture) Ltd are specialist manufacturers of quality laboratory and educational furniture. The University of St Andrews is one of the most prestigious higher education facilities in the UK. Set on the east coast of Scotland, the University’s world-renown...

Burrington Estates, Plymouth

Stunning, low-maintenance exteriors with Trespa Pura NFC®Cladding Trespa Pura NFC® cladding was recently used by our customer Westclad Ltd on high-specification homes by Burrington Estates in one of the most sought-after locations in Plymouth. The luxurious,...

University of West Scotland – Edzell Building

  Lab UK (Furniture) Ltd are specialists in manufacturing quality laboratory and educational furniture. One of Lab UK's most recent projects, completed in September 2019, was the Edzell Building at the University of West Scotland.  Situated...

Bader International Study Centre (BISC)

It's not very often that we feature a castle on our website but this magnificent building, Herstmonceaux Castle, is the location of the Bader International Study Centre (BISC) - the prestigious UK campus of Canada’s Queen’s University. Our...

BBI Group Global Headquarters

BBI Group's £14m investment, supported with a £1.8m grant from the Welsh Government, facilitated a move in April 2018 to a new 120,000sq ft headquarters and manufacturing centre in Crumlin, Caerphilly. Scitech UK, working with our customer FBS Contracts...

Hayling Island Community Centre

Speltham Contracts Ltd recently completed a two storey annexe at Hayling Island Community Centre, incorporating a new Café, meeting rooms and 1st-floor outdoor cricket viewing terrace with a disabled lift and facilities. Their inventive use of Trespa...

KalVista Pharmaceuticals

APMG recently designed and fitted modern, fresh, hardwearing labs for KalVista Pharmaceuticals in its facilities in Salisbury. KalVista required new purpose-built laboratories which combined a safe, light, energising work environment with an ergonomic layout. The new labs...

University of Hertfordshire

New Science Building The University of Hertfordshire’s New Science Building is a £30m 9000m2 Sheppard Robson/BDP designed facility. The building houses numerous science-based departments, previously located in various locations throughout the...

Easter Bush Campus Laboratories

The Centre Building on the University of Edinburgh’s Easter Bush Campus, a part of the Roslin Institute, is a new £30m multi-use development completed in 2017. ALS (UK) LLP was requested by McLaughlin & Harvey, the main contractor, to outfit laboratories in...

Sheffield Sheaf and Stem Building Refurbishment

Kinetic Laboratories Ltd using Trespa® TopLab®PLUS at Sheffield Hallam University.    Kinetic Laboratories Ltd was proud to be selected to manufacture and install all the furniture in the £11 million refurbishments to the Sheaf and Stem Building...

William Blythe Full Laboratory Refurbishment

William Blythe is a manufacturer of inorganic speciality chemicals and advanced materials. In 2016 they contracted Mark Finn Laboratory Furniture to refurbish all of their laboratories over 2 floors and to repurpose existing areas in both sub-offices and new labs. Mark Finn...

Immunocore Buildings - Milton Science Park

Immunocore Buildings 91 and 96 Immunocore is a clinical stage biotechnology company based in Oxfordshire who research and develop biological drugs to treat cancer, infectious diseases and autoimmune diseases. As part of Immunocore’s extensive expansion plans to...

Holywell Learning Centre

Holywell Learning Centre was a flagship £30 million development on land at the top of the existing High School field, amalgamating three schools into one new school overlooking the Dee Estuary in Flint, North Wales. The campus provides educational services...

Skipton Properties, The Bridge, Haworth

The Bridgehouse project, by Skipton Properties, involves the conversion of a listed mill building and new extension into retirement living apartments. The site also features new 2 and 3 storey family houses arranged into a high-quality mill courtyard setting. The...

Right
Left

Contact Us

I also give consent to be contacted by email for product information, offers and marketing purposes: